| Customization: | Available |
|---|---|
| Certification: | CE, ISO, SGS |
| Automation: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

| Category 1 | Equipment name |
| 1. Cold slag electric melting furnace. | 1. Non-standard electric furnace transformer. |
| 2. Holding brake; | |
| 3. Pressure ring; | |
| 4. Bellows; | |
| 5. Copper tiles; | |
| 6. Short network; | |
| 7. Water-cooled cable; | |
| 8. Water-cooled compensator; | |
| 9. Insulation fixture | |
| 10. Short net connection bridge, | |
| 11. Other short network supporting facilities, | |
| 12. Electric furnace cover, | |
| 13. Electric furnace body, | |
| 14. Heat dissipation base, pipe and fan | |
| 15. Hydraulic system, | |
| 16. Cooling system, | |
| 17. Electrical control system, sensors, wires and cables and PLC | |
| 18. Professional construction cost of the first castable refractory. ( 5 Chinese workers and 24 days. Need to coordinate technical issues to decide how many people needed finally.) | |
| 19. First overall refractory plan (designed and manufactured according to two to three years of overhaul, one minor repair per year. Designed according to production cycle.) | |
| 20. First carbon rod | |
| 21. Other accessories | |
| Category 2 (Electric Furnace Supporting Equipment) | Equipment name |
| 2. Supporting system. | 1. Batching and feeding system |
| 2. Drying system. | |
| 3. Input, storage, weighing and unloading system. | |
| 4. Electric control system. | |
| Category 3 (Electric furnace supporting environmental protection) | Equipment name |
| 3. Electric furnace supporting system. | 1. Cyclone dust removal machine |
| 2. Air-cooled temperature reducer | |
| 3. High temperature cloth bag dust removal | |
| 4. FRP desulfurization tower | |
| 5. Electric control system for dust removal system | |
| Category 4 (Electric Furnace Supporting Service) | Equipment name |
| 1. Overall guide installation service, (guide and assist in installation) | |
| 2. Transformer, hydraulic, short network, technical service engineer (guide and assist in installation) | |
| 3. Electrical control installation and production commissioning engineer (guide and assist in the installation, responsible for commissioning, continuous operation for 3 days) | |
| 4. Technical maintenance and training engineers (responsible for maintenance and operation, and training) | |
| 5. Optional: Contract installation services |




