Customization: | Available |
---|---|
Certification: | CE, ISO, SGS |
Automation: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Category 1 | Equipment name |
1. Cold slag electric melting furnace. | 1. Non-standard electric furnace transformer. |
2. Holding brake; | |
3. Pressure ring; | |
4. Bellows; | |
5. Copper tiles; | |
6. Short network; | |
7. Water-cooled cable; | |
8. Water-cooled compensator; | |
9. Insulation fixture | |
10. Short net connection bridge, | |
11. Other short network supporting facilities, | |
12. Electric furnace cover, | |
13. Electric furnace body, | |
14. Heat dissipation base, pipe and fan | |
15. Hydraulic system, | |
16. Cooling system, | |
17. Electrical control system, sensors, wires and cables and PLC | |
18. Professional construction cost of the first castable refractory. ( 5 Chinese workers and 24 days. Need to coordinate technical issues to decide how many people needed finally.) | |
19. First overall refractory plan (designed and manufactured according to two to three years of overhaul, one minor repair per year. Designed according to production cycle.) | |
20. First carbon rod | |
21. Other accessories | |
Category 2 (Electric Furnace Supporting Equipment) | Equipment name |
2. Supporting system. | 1. Batching and feeding system |
2. Drying system. | |
3. Input, storage, weighing and unloading system. | |
4. Electric control system. | |
Category 3 (Electric furnace supporting environmental protection) | Equipment name |
3. Electric furnace supporting system. | 1. Cyclone dust removal machine |
2. Air-cooled temperature reducer | |
3. High temperature cloth bag dust removal | |
4. FRP desulfurization tower | |
5. Electric control system for dust removal system | |
Category 4 (Electric Furnace Supporting Service) | Equipment name |
1. Overall guide installation service, (guide and assist in installation) | |
2. Transformer, hydraulic, short network, technical service engineer (guide and assist in installation) | |
3. Electrical control installation and production commissioning engineer (guide and assist in the installation, responsible for commissioning, continuous operation for 3 days) | |
4. Technical maintenance and training engineers (responsible for maintenance and operation, and training) | |
5. Optional: Contract installation services |